Legislature(2019 - 2020)SENATE FINANCE 532
05/06/2019 09:00 AM Senate FINANCE
Note: the audio and video recordings are distinct records and are obtained from different sources. As such there may be key differences between the two. The audio recordings are captured by our records offices as the official record of the meeting and will have more accurate timestamps. Use the icons to switch between them.
Audio | Topic |
---|---|
Start | |
HB14 | |
SB91 | |
HB106 | |
Adjourn |
* first hearing in first committee of referral
+ teleconferenced
= bill was previously heard/scheduled
+ teleconferenced
= bill was previously heard/scheduled
*+ | HB 106 | TELECONFERENCED | |
+ | TELECONFERENCED | ||
+= | HB 14 | TELECONFERENCED | |
+= | SB 91 | TELECONFERENCED | |
SENATE BILL NO. 91 "An Act relating to the development and operation of a hydroelectric site at the Nuyakuk River Falls; providing for the amendment of the management plan for the Wood-Tikchik State Park; and providing for an effective date." 9:23:45 AM Co-Chair von Imhof relayed that the bill had been previously heard on April 30, 2019. Public testimony had been taken and was closed. 9:24:30 AM Ms. Lucky discussed the proposed changes to the bill. She emphasized that the intent of the bill had not changed. She spoke to an Explanation of Changes document (copy on file): AS 41.21.161 Establishes the Wood-Tikchik State Park; AS 41.21.167 lists incompatible uses and specifies certain uses that are allowed (or "not considered an incompatible use"). The previous version of SB91 simply added Nuyakuk River Falls to existing section (c), which allowed development and operation of a hydroelectric site and Lake Elva or Grant Lake. The proposed CS puts this project in its own section (e) and defines specific conditions for this site, listed on page 1, lines 8-11, in order to respond to local concerns about this project. Ms. Lucky stated that the conditions for the site included in the new subsection were as follows: (e) The development and operation of a hydroelectric site at the Nuyakuk River Falls is a compatible use if the development and operation (1) does not include a dam that fully spans a river; (2) maintains at least 70 percent of the daily upstream water flow of an affected river along the natural course of the river; and (3) after July 1, 2024, is licenses by the Federal Energy Regulatory Commission 9:26:42 AM Senator Hoffman thanked Co-Chair von Imhof's office for accommodating the conditions. He supported adoption of the CS. Co-Chair Stedman MOVED to ADOPT proposed committee substitute for SB 91, Work Draft 31-LS0520\S (Wallace, Fisher, 5/4/19). There being NO OBJECTION, it was so ordered. CSSB 91(FIN) was REPORTED out of committee with a "no recommendation" recommendation and with one previously published fiscal impact note: FN 1(DNR).
Document Name | Date/Time | Subjects |
---|---|---|
HB106 ver A Sponsor Statement 3.26 (1).pdf |
HFIN 4/1/2019 1:30:00 PM SFIN 5/6/2019 9:00:00 AM |
HB 106 |
HB106 ver A Back Up Information - School Debt Spreadsheet 4.17.19.pdf |
SFIN 5/6/2019 9:00:00 AM SFIN 2/14/2020 9:00:00 AM |
HB 106 |
SB 91 CS SB 91 (FIN) v. S work draft.pdf |
SFIN 5/6/2019 9:00:00 AM |
SB 91 |
SB 91 CS SB 91 (FIN) v. S Explanation.pdf |
HRES 5/8/2019 1:00:00 PM HRES 5/10/2019 1:00:00 PM SFIN 5/6/2019 9:00:00 AM |
SB 91 |
HB 14 SCS CSHB 14 (FIN) v. H Statutory References.pdf |
SFIN 5/6/2019 9:00:00 AM |
HB 14 |
HB 14 SCS CSHB 14 (FIN) v. H.pdf |
SFIN 5/6/2019 9:00:00 AM |
HB 14 |
HB 14 SCS CSHB 14 (FIN) v. H Explanation.pdf |
SFIN 5/6/2019 9:00:00 AM |
HB 14 |